Note: Please note, that restart of an interrupted optimization should not be confounded with starting the (sensitivity based topology) optimization newly with an already existing material distributation. In general this initial material distribution is derived from a previous optimization run and defined using the parameter INITIAL_DV_FIELD in the command DV_TOPO. Requirements for a restartIt is not always possible to resume the optimization after an interruption. Certain requirements have to be fulfilled to be able to restart a SIMULIA Tosca Structure optimization. A restart of an externally interrupted SIMULIA Tosca Structure job can be carried out when the following problems occur:
Restart processDuring a restart, all settings of the original task are used to resume the optimization. There is no possibility of modifying the settings for a restart because the parameter file cannot be loaded again. But you may change the -- logevel-parameters in the command line. The start directory of the optimization task can be moved to any location.
For example, if the task was interrupted due to insufficient hard disk space and there is no possibility to create more space on the hard disk, the complete job directory can be transferred to another hard disk and a restart can be made from there. After optimization has been stopped, the files that were created during the optimization can be found either in the directory jobname/DB_ERROR or (when the control job has been interrupted) in the working directory (jobname). At the beginning of a restart, all data is copied into the working directory (jobname). Various methods are available for a restart:
|